Short answer: timing How long does it take to install airport ads?

Plan 21 to 28 days from artwork delivery to an installed static unit: printing, then installation by the media owner's crew scheduled around airport operations. Digital units need no installation; files are due 14 to 18 business days before start and are loaded and tested by the media owner.

We’ll follow up with the kit and next steps for your campaign.

  • 125+Airports worldwide
  • 40+Media vendors
  • 5Continents served

You’re in good company

  • Thomson Reuters
  • AMD
  • Dynatrace
  • Fortinet
  • Motorola
  • BYU

The detail

The short version,
then the full page.

Large wraps, jet bridges, and exteriors can take longer because of airside access, and security trays need artwork six to eight weeks before start because the graphics are printed and rotated through every checkpoint. The install is scheduled by the media owner, not the advertiser.

Installation timing by airport format
FormatArtwork or file dueInstalled by
Digital networks and spectaculars14–18 business days before startNo install; loaded and tested
Banners, static spectaculars, wraps21–28 days before startThe media owner's crew, around operations
Jet bridges, exteriors, large wraps21–28 days, often longerAirside install windows
Security trays6–8 weeks before startPrinted and rotated by the tray program

Planning figures, media only, from the airport advertising cost and lead-times pages.

This is the short answer. Read the lead-times page.

Ready to plan?

Have airports and dates?
Send a brief.

Tell us the airports, the dates, who you need to reach, and the budget range. We come back with current availability at every airport in the plan and a recommended mix.

125+ airports · 40+ media vendors · Since 2015

Airports, start date and duration, campaign goal, budget range, and anything else you can share. A few lines is plenty.

We come back with current availability and a recommended mix.

Questions

Related questions

Who installs airport ads?

The media owner's crew, or for trays the program's vendor; the advertiser supplies artwork to spec.

Can installation be rushed?

Rarely; crews work around airport operations. Digital is the fast path.

What happens if artwork is late?

The unit runs late or empty under a non-cancellable contract.

What does EAM Advertising handle on an airport campaign?

Everything after the objective. We check what's open for the week, which loops are crowded and which units will sell out, and where on the arrival path your audience actually walks. We recommend the mix, secure the units, traffic the creative through airport approval, confirm posting on day one, and deliver proof of posting and play logs after. If the airport is one market in a larger plan, the same relationship covers the others.

Airport advertising media agency. 125+ airports. Est. 2015.

Want the full picture?
Start with the media kit.

Send your work email for the media kit: formats, planning ranges, and booking windows across 125+ airports. We’ll follow up to learn who you need to reach and when.

We’ll follow up to learn who you need to reach and when.

125+ airports · 40+ media vendors · Since 2015

Sources

Sources
and methodology

  1. Figures: the airport advertising cost page, the lead-times page, the budget page, and the companies-vs-agencies page, which carry the full ranges, sources, and verification dates.
  2. EAM Advertising planning and buying records across 125+ airports and 40+ media vendors, 2015–2026.

Updated October 5, 2026 · By EAM Advertising